Things to be done prior to flooring crew arriving.
- Remove all books, magazines and etc. from shelves
- Remove all items from the top of desks, credenzas, tables, etc.
- Remove all items from the bottom of closets. These items should be boxed and moved to an area not involved in the installation
- Desks will have to be tilted on end to be moved from the room. Be sure small items are secured and any bottle caps are on tight. You can expect drawer content to be disarrayed due to tilting the desk. In some cases, due to the age or weak construction, desks cannot be moved with contents in the drawers. This will be at the discretion of the tenant and damage caused to the desk will be the responsibility of the tenant. Moving of contents should be done prior to our arrival to accomplish move-out.
- Some metal file cabinets or other metal storage furniture of light construction may sustain damage when moved loaded. Such cases will be at the discretion of the tenant and any damage caused to furniture moved loaded will be the responsibility of the tenant. Moving of contents should be done prior to our arrival to accomplish move-out. For ease and safety we recommend that you empty the top two drawers of vertical and horizontal file cabinets.
- Arrangements to have computers, printers, telephones, teletypes, copiers or any related specialty equipment moved by specialists should be completed prior to the installation date.
- Specialists must complete any moving or relocating of modular units or systems furniture prior to installations (unless the modular units are being lifted). If modular lifting is done, all items in overheads and drawers should be emptied. All items pinned to panels should be removed.
- Plumbing connections should be dis-connected, and re-connected by a licensed plumber.